Workshop Project

This is a photo album documenting the construction of storage and workshop buildings in my backyard. The excavation of sod and dirt began on July 9th, 2008. Running electric power to site was completed July 14th. Concrete pour was on July 16th. Building construction started at 9:30 AM and was completed by two workers at 7:30 PM on August 5th. Electrical wiring inside completed August 8th. Insulation installed on walls and ceiling on August 11th. Drywall installed and taped on August 15th. and interior painting was completed on August 18th. Exterior painting was done on August 19th. Flooring was installed on August 20th. Light fixtures, outlets and switches were installed on August 21st. A wing rack was installed in the storage building on August 22nd. Work benches were moved into the workshop on August 24th.